Stonebrooke Engineering provided construction surveying services on both phases of the Metro Transit Police Department Building project. Phase 1 consisted of site preparations to reconstruct the driveway serving as the access route for the Heywood Garage. Phase 2 included the construction of a three-story addition to the existing five-story office building on the site.
Metro Transit Police Department Building
Services
Land Surveying & Mapping
Client
Sheehy Construction
Location
Minneapolis, MN
Project Overview
Beyond Design
Along with the building addition, the parking lot and site utilities were reconfigured. Other site improvements including sanitary and storm sewers, water services, geothermal wells for heating and cooling the building, and the parking lot curb and pavement, were all staked for construction.