Metro transit police header

Metro Transit Police Department Building

Services Land Surveying & Mapping
Client Sheehy Construction
Location Minneapolis, MN

Project Overview

Stonebrooke Engineering provided construction surveying services on both phases of the Metro Transit Police Department Building project. Phase 1 consisted of site preparations to reconstruct the driveway serving as the access route for the Heywood Garage. Phase 2 included the construction of a three-story addition to the existing five-story office building on the site.

Beyond Design

Along with the building addition, the parking lot and site utilities were reconfigured. Other site improvements including sanitary and storm sewers, water services, geothermal wells for heating and cooling the building, and the parking lot curb and pavement, were all staked for construction.