The I-35W Minnesota River Bridge project provided a new bridge replacing the old I-35W bridge over the Minnesota River between the cities of Burnsville in Bloomington. The project also consisted of reconstructing the I-35W bridge spanning 106th Street, reconstructing the roadway between Cliff Road and 106th Street, constructing a trail between Black Dog Road and Lyndale Avenue, and improving signing, lighting, and drainage.
I-35W Minnesota River Bridge Design Build Project
Services
Surveying
Client
MnDOT District 2
Estimated Construction Cost
$127M
Location
Between the cities of Bloomington and Burnsville.
Project Overview
Beyond Design
Stonebrooke Engineering provided construction surveying, settlement monitoring, and as-built surveying on the project.