X100 0496 1600x1200 jpg pagespeed ic yz Yw L ahd T

CSAH 68 at CSAH 91

Services Transportation Design, Water Resources
Client Scott County
Estimated Construction Cost $1.0M
Location Scott County, MN

Project Overview

Scott County selected us to provide preliminary and final design of a roundabout at the intersection of CSAH 68 at CSAH 91 in Credit River Township.

X IMG 4089 1600x1200 jpg pagespeed ic v GVM Pxu Q Jk

Beyond Design

This project included roundabout roadway and pavement design, storm sewer design, lighting design, traffic staging, plus turf and erosion control. Improvements to this intersection included the realignment of approximately 1,800 lineal feet of CSAH 68 and 2200 lineal feet of CSAH 91 to accommodate the roundabout and approaches.

X CSAH 68 at 91 1600x920 jpg pagespeed ic 5l N0ajz Oo

Community Responsibility

Additionally, we felt it was critical to provide an ICE report for traffic operations and safety review, and a Project Memo detailing the environmental impacts of the project. Our staff provided roundabout education at a public open house meeting adjacent to the project location.