Project Overview

The Cambridge-Isanti Bike Trail features 2.3 miles of bituminous trail, and 0.3 miles of elevated boardwalk bridge trail (Bridge No. 30516.), for a total length of approximately 2.6 miles. The new trail is a non-motorized, multi-use trail that connects the Cities of Cambridge and Isanti, Minnesota.

Xin trail3 4c 1600x1068 jpg pagespeed ic b Yp K Yytx R

Beyond Design

We were selected to provide construction services on this project, including construction inspection, materials testing, and construction staking. Our team also provided record drawings, material testing, and project documentation in accordance with federal funding requirements. This project included federal funds and was completed following the Delegated Contract Process (DCP).


On this project, the construction plans did not accurately reflect the field conditions, and our staff redesigned nearly 75% of the horizontal and vertical trail alignments in order to make a constructible design, while still meeting all federal aid deadlines.

X Isanti1 1600x957 jpg pagespeed ic 3 Elob LY32 S

Community Responsibility

Local and regional concerns included economic and public safety impacts, construction staging, bridge characteristics, recreational use of the area, and the overall construction schedule. We worked closely with both local and regional representatives to ensure their voices were heard throughout the life of the project.