TH 3 at Amana Trail

This project involved the development of concept layouts, detail design plans, specifications, and cost estimates for a multi lane roundabout at the Intersection of TH 3 and Amana Trail in Inver Grove Heights. The design included a multi-lane, 3 leg roundabout that was designed for expansion into a full multi-lane four leg roundabout. Design services included detail plans for roadway geometrics, profiles, bituminous surfacing, concrete pavement design, drainage design, landscaping, roundabout design, and lighting. In addition, Stonebrooke provided project management and agency coordination services to ensure that the needs of MnDOT, Dakota County, and the City of Inver Grove Heights were met. Additional coordination efforts were necessary to ensure the proposed project would integrate seamlessly with adjacent development properties.

  • Categories:
    Final Design, Preliminary Design, Water Resources
  • Client:
    City of Inver Grove Heights
  • Estimated Construction Cost:
    $3.0M
  • Location:
    Inver Grove Heights, MN