Stonebrooke Engineering was selected by Nicollet County to provide engineering and surveying services for roadway design, including a roundabout at the CSAH 5 (Broadway Avenue) & Gardner Road intersection, storm sewer improvements, and concrete paving.  The roundabout is being designed and constructed in preparation for the opening of Saint Peter High School just north of the project, which is slated for opening in the fall of 2017. The project will also include concrete inlay of CSAH 5 east of the roundabout, where the curb will stay in place but the bituminous pavement will be removed and replaced with new concrete pavement. The design plans are underway and will be completed in 2016. Construction is anticipated to begin in 2017.

  • Categories:
    Final Design, Preliminary Design, Surveying
  • Client:
    Nicollet County
  • Location:
    St. Peter, MN